設備(bei)簡介(jie)/Equipment introduction:
LHXN型周(zhou)邊傳動刮(gua)吸(xi)泥機用(yong)于污水處理(li)廠(chang)圓形二沉(chen)池(chi),將沉(chen)降(jiang)在池(chi)底的污泥刮(gua)集(ji)(ji)至(zhi)一組沿半徑方向(xiang)布(bu)置(zhi)的吸(xi)泥管(guan)管(guan)口,再(zai)通過中(zhong)心(xin)排泥管(guan)排出(chu),以便污泥回(hui)流或(huo)濃縮脫水,同時(shi)將池(chi)面的浮渣(zha)(zha)撇向(xiang)集(ji)(ji)渣(zha)(zha)斗,通過集(ji)(ji)渣(zha)(zha)斗排出(chu)池(chi)外,以便進一步處理(li)。
LHXN periphery drive scraping sucking machine used in sewage treatment plant of round second pond, at the bottom of the sludge sedimentation scrape along the radius of a group to set the direction of sucking decorate, again through the center tube, row mud tube to return sludge dewatering, or enrichment to set the apostrophe scum pool, slag discharge by integrating slag pool, to fight for further treatment.
工作原理/Principle:
周邊傳動(dong)刮(gua)(gua)吸(xi)泥(ni)機由(you)主(zhu)(zhu)梁、端梁、驅動(dong)裝(zhuang)置、刮(gua)(gua)泥(ni)板(ban)、抽真空系統、導(dao)流(liu)筒(tong)、撇渣裝(zhuang)置、集(ji)(ji)渣斗、中(zhong)心(xin)支座、集(ji)(ji)電器、控制柜(ju)等組(zu)成(cheng)。主(zhu)(zhu)梁在(zai)驅動(dong)裝(zhuang)置帶(dai)動(dong)下(xia),繞(rao)池(chi)(chi)中(zhong)心(xin)軸線旋(xuan)轉(zhuan),將沉積(ji)在(zai)池(chi)(chi)底(di)的(de)(de)污(wu)泥(ni)由(you)刮(gua)(gua)泥(ni)板(ban)刮(gua)(gua)集(ji)(ji)至(zhi)各(ge)吸(xi)泥(ni)口,在(zai)液位的(de)(de)作用下(xia),污(wu)泥(ni)經吸(xi)泥(ni)口,輸(shu)泥(ni)槽、虹吸(xi)管、中(zhong)心(xin)泥(ni)罐、中(zhong)心(xin)排(pai)泥(ni)管排(pai)至(zhi)污(wu)泥(ni)坑(keng)。每個吸(xi)泥(ni)管上(shang)端設有調節器,以(yi)調節各(ge)吸(xi)泥(ni)管的(de)(de)流(liu)量分配。同時,液面上(shang)的(de)(de)浮渣向隨主(zhu)(zhu)梁旋(xuan)轉(zhuan)的(de)(de)撇渣板(ban)和周邊浮渣擋板(ban)形成(cheng)的(de)(de)漸縮區域(yu)內集(ji)(ji)中(zhong),直至(zhi)其封(feng)閉邊—刮(gua)(gua)渣擺(bai)臂(bei)。由(you)擺(bai)臂(bei)上(shang)的(de)(de)刮(gua)(gua)渣板(ban)刮(gua)(gua)集(ji)(ji)至(zhi)集(ji)(ji)渣斗排(pai)出池(chi)(chi)外。
Peripheral drive scraping sucking machines.As shown by the girders.Composed with girders,device drivers,scraping city-state,vacuum system,diversion,slag device,abandoned,slag,electrical appliances,bearing center control etc.Main driving device drivers by the center axis rotate around the pool.And deposition in the bottom of the sludge wind blow by integrating to the city-state,sucking in level,under the action of sludge.Lost by sucking mud trough,region,center.The center row mud clay POTS and sludge pit tube.Each pipe with regulator. To adjust the pipe of the flow rate distribution.At the same time,the scum on liquid to rotate with slag plate girder abandoned and the gradual formation baffle scum.Till its concentration areas closed side-shave slag swing arm.On the swing arm scraping by scraping board to set collection slag discharge the slag fights.When we come to the electric control.According to the needs of user can set the rev,stop and equipment running time,can match with PLC interface.
400電話
手機網站